Cost ranges in Orange County
All-in ranges for a licensed contractor: labor, materials, permits and cleanup.
Same layout. New counters, backsplash, fixtures, lighting and paint.
3–5 weeks of workNew cabinetry, stone, appliances, lighting and flooring. Layout mostly the same.
8–12 weeks of workWalls moved or opened, plumbing and gas relocated, new island.
10–14 weeks of workCustom cabinetry, pro appliances, natural stone, full open-concept rebuild.
12–16 weeks of workWhat a full project includes
A real proposal lists every one of these as its own line. If a bid lumps them together, ask what’s missing.
- Demo & protectionTear-out, haul-away, dust walls and floor protection.
- CabinetryBoxes, doors, hardware and installation.
- Counters & backsplashTemplating, fabrication and install.
- Plumbing & gasSink, dishwasher, pot filler and range connections.
- Electrical & lightingNew circuits, under-cabinet and recessed lighting, to code.
- FlooringMatched to adjoining rooms where possible.
- AppliancesInstallation and venting, whether you buy or we source.
- Finish & permitsPaint, trim, inspections and a final clean.
What moves the price
Two projects the same size can land tens of thousands apart. These choices make the biggest difference.
- Layout changes
- Moving walls, plumbing or gas lines adds structural, permit and trade cost.
- High impact
- Cabinetry
- Stock vs. semi-custom vs. custom is the single biggest line item.
- High impact
- Stone
- Quartz vs. quartzite or marble, edge details and waterfall ends.
- High impact
- Appliances
- Standard vs. panel-ready vs. pro-style ranges and ventilation.
- Medium impact
- Electrical capacity
- Older homes may need a panel upgrade for modern appliances.
- Varies
- Age of the home
- Old plumbing, wiring or hidden damage. We price a clear contingency up front.
- Varies

How long it takes
- 3–6 wksDesign & selections
- 2–6 wksPermits (varies by city)
- 8–12 wksConstruction
Cabinet lead times are what usually set the schedule. We order before demo, so your kitchen isn’t torn out while you wait on boxes.
Why bids vary, and how to compare them
The lowest bid usually isn’t the cheapest job. The gap shows up later, as allowances that run out and change orders nobody explained. Before you compare totals, check each bid for:
- A line-item price, not one number for the whole job
- Allowances for finishes, and whether they’re realistic
- A written start and finish date
- Who’s on site every day, and who you call
- How change orders work, in writing
- A workmanship warranty, in writing
How we price: one fixed, line-item number and a written schedule before we start. No change order without your signature. It’s all part of the Timberline Certainty Promise.
Common questions
Is it worth moving the kitchen layout?
Sometimes. Opening a wall or adding an island can change how the whole house works, but it adds structural and permit cost. We price both options so you can decide.
Can we live at home during a kitchen remodel?
Usually, yes. We set up a temporary kitchen, seal off the work area and clean up every day.
What’s the biggest hidden cost?
Electrical capacity and what’s behind the walls. We check both during the walkthrough and price them up front.
How do I get an exact number for my kitchen?
Book a consultation. We’ll walk the space and give you a fixed, line-item proposal.