Cost ranges in Orange County
All-in ranges for a licensed contractor: labor, materials, permits and cleanup.
Converts an existing garage. Foundation and structure already exist.
3–5 months of workAn addition with its own entrance, kitchen and bath.
5–7 months of workA new standalone unit with new foundation and utilities.
6–9 months of workUp to 500 sq ft inside the existing home.
2–4 months of workWhat a full project includes
A real proposal lists every one of these as its own line. If a bid lumps them together, ask what’s missing.
- FeasibilitySetbacks, utilities and what your city allows.
- Plans & engineeringArchitectural, structural and Title 24 energy reports.
- Permits & feesPlan check, permit and any impact or utility fees.
- Site workGrading, foundation, trenching and utility runs.
- ShellFraming, roofing, windows, doors and exterior finish.
- SystemsPlumbing, electrical, HVAC and water heating.
- Kitchen & bathCabinets, counters, fixtures and tile.
- Finish & finalFlooring, paint, inspections and a final clean.
What moves the price
Two projects the same size can land tens of thousands apart. These choices make the biggest difference.
- Type of ADU
- Conversion vs. attached vs. detached is the biggest cost decision.
- High impact
- Utilities
- Distance to sewer, water and electrical service, and whether the panel needs an upgrade.
- High impact
- Site conditions
- Slopes, soil, access and tree removal.
- Medium impact
- Size & finishes
- Square footage and the level of kitchen and bath finishes.
- Medium impact
- City & HOA rules
- Design requirements, fees and HOA review vary by community.
- Varies
- Soft costs
- Plans, engineering, surveys and permit fees before construction.
- Varies

How long it takes
- 2–3 moDesign & plans
- 2–6 moPermits
- 5–9 moConstruction
Permits are the longest unknown with an ADU. We check feasibility and utilities before you pay for full plans.
Why bids vary, and how to compare them
The lowest bid usually isn’t the cheapest job. The gap shows up later, as allowances that run out and change orders nobody explained. Before you compare totals, check each bid for:
- A line-item price, not one number for the whole job
- Allowances for finishes, and whether they’re realistic
- A written start and finish date
- Who’s on site every day, and who you call
- How change orders work, in writing
- A workmanship warranty, in writing
How we price: one fixed, line-item number and a written schedule before we start. No change order without your signature. It’s all part of the Timberline Certainty Promise.
Common questions
Can I build an ADU on my lot?
Most single-family lots in Orange County can add some form of ADU under state law, but setbacks, utilities and HOA rules vary. We check before you spend on plans.
Does an ADU need its own utilities?
Not always. Many share water and sewer with the main house, but electrical capacity often needs an upgrade.
Is a garage conversion cheaper?
Usually, because the structure and foundation already exist. It depends on the garage’s condition.
How do I get an exact number?
Book a consultation. We’ll walk the lot, check feasibility and give you a fixed, line-item proposal.