Book a consultation (949) 229-1692

Cost Guide · Updated September 2026

How much does a kitchen remodel cost in Orange County?

The short answer

Most full kitchen remodels in Orange County cost $75K to $150K. Large or high-end kitchens run $150K to $250K+.

Size, layout changes, finishes and what’s behind the walls move the number most. Your proposal will be one exact, fixed number.

Cost ranges in Orange County

All-in ranges for a licensed contractor: labor, materials, permits and cleanup.

Refresh$35K – $60K

Same layout. New counters, backsplash, fixtures, lighting and paint.

3–5 weeks of work
Full remodel$75K – $150K

New cabinetry, stone, appliances, lighting and flooring. Layout mostly the same.

8–12 weeks of work
Layout change$120K – $200K

Walls moved or opened, plumbing and gas relocated, new island.

10–14 weeks of work
High-end custom$200K – $250K+

Custom cabinetry, pro appliances, natural stone, full open-concept rebuild.

12–16 weeks of work

What a full project includes

A real proposal lists every one of these as its own line. If a bid lumps them together, ask what’s missing.

  • Demo & protectionTear-out, haul-away, dust walls and floor protection.
  • CabinetryBoxes, doors, hardware and installation.
  • Counters & backsplashTemplating, fabrication and install.
  • Plumbing & gasSink, dishwasher, pot filler and range connections.
  • Electrical & lightingNew circuits, under-cabinet and recessed lighting, to code.
  • FlooringMatched to adjoining rooms where possible.
  • AppliancesInstallation and venting, whether you buy or we source.
  • Finish & permitsPaint, trim, inspections and a final clean.

What moves the price

Two projects the same size can land tens of thousands apart. These choices make the biggest difference.

Layout changes
Moving walls, plumbing or gas lines adds structural, permit and trade cost.
High impact
Cabinetry
Stock vs. semi-custom vs. custom is the single biggest line item.
High impact
Stone
Quartz vs. quartzite or marble, edge details and waterfall ends.
High impact
Appliances
Standard vs. panel-ready vs. pro-style ranges and ventilation.
Medium impact
Electrical capacity
Older homes may need a panel upgrade for modern appliances.
Varies
Age of the home
Old plumbing, wiring or hidden damage. We price a clear contingency up front.
Varies
Remodeled kitchen with a white shaker island, marble-look counters, floating oak shelves and a scallop tile backsplash
Full remodelTypical range: $75K – $150K

How long it takes

  1. 3–6 wksDesign & selections
  2. 2–6 wksPermits (varies by city)
  3. 8–12 wksConstruction

Cabinet lead times are what usually set the schedule. We order before demo, so your kitchen isn’t torn out while you wait on boxes.

Why bids vary, and how to compare them

The lowest bid usually isn’t the cheapest job. The gap shows up later, as allowances that run out and change orders nobody explained. Before you compare totals, check each bid for:

  • A line-item price, not one number for the whole job
  • Allowances for finishes, and whether they’re realistic
  • A written start and finish date
  • Who’s on site every day, and who you call
  • How change orders work, in writing
  • A workmanship warranty, in writing

How we price: one fixed, line-item number and a written schedule before we start. No change order without your signature. It’s all part of the Timberline Certainty Promise.

Common questions

Is it worth moving the kitchen layout?

Sometimes. Opening a wall or adding an island can change how the whole house works, but it adds structural and permit cost. We price both options so you can decide.

Can we live at home during a kitchen remodel?

Usually, yes. We set up a temporary kitchen, seal off the work area and clean up every day.

What’s the biggest hidden cost?

Electrical capacity and what’s behind the walls. We check both during the walkthrough and price them up front.

How do I get an exact number for my kitchen?

Book a consultation. We’ll walk the space and give you a fixed, line-item proposal.

Cost Guide

take the full guide.

Real ranges for kitchens, baths and whole homes, plus a checklist for comparing bids.

One email with the guide. No spam, no sales calls.

Book a consultation

Get a fixed price for your project.

We take on a limited number of projects each year.

5.0 on Google · 23 reviews

(949) 229-1692 justin@timberlinebuild.co San Clemente · South Orange County

You’ll hear from Justin personally, usually within the hour.

Call Book a consultation